identification of device(s) and all operating pressureĭ) Piping designed to safely discharge gas from safety or control devices and.The drawings should include a title block with the installation address.ī) The location of valves, pressure control regulators and other controls or devices installed within the piping andĬ) The location of any gas meter (but not the gas company’s meter) and Part 1 – Details of the gas installation, including drawings of:Ī) The general arrangement of the consumer piping andĪ legible schematic (preferably in CAD format using the symbols in AS/NZS 5601.1 appendix P). Table 1 – Schedule 8 information requirements Requirement Table 1 lists the additional information a Schedule 8 requires and provides additional detail to assist with sourcing the information. If additional information is required, ESV will send a written request detailing what it is. If an applicant believes parts of Schedule 8 do not apply, then this should be stated in the application, including the reasons why. The additional design and planning is required to ensure compliance and an acceptable safety outcome for the community. The application for acceptance requires the Schedule 8 information because of the additional risks introduced into a gas installation by a high gas load, high pressure, or the installation being within a high rise building. This requirement is generally specified under section 73 of the Gas Safety Act 1997, and is specified in detail under Regulation 26 Part 2 and Schedule 8 of the Gas Safety (Gas Installation) Regulations 2018. Is being installed in a building exceeding 10 storeys above ground level.Has an operating pressure exceeding 200 kilopascals.Has a total gas rate exceeding 3.8 gigajoules per hour.This gas information sheet explains the additional information required to accompany an application for acceptance of a gas application that falls into one of the following categories: Energy Safe Victoria Gas technical information sheets Gas information sheet 60: Schedule 8 requirements – Gas installation acceptance Gas information sheet 60: Schedule 8 requirements – Gas installation acceptance
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |